Appendix F — Downsizing
when the project survives but shrinks
- The grid in the introduction assumes a project either carries on or comes to an end
- Downsizing is a third case: the project continues, but with significantly less money, fewer people, or both
- A 50% cut is not fatal by itself, but enough that “business as usual” is no longer an option
- The cut is usually someone else’s decision made on someone else’s timetable
- The goal is not to close the project or hand it over, but to shrink it without breaking it
F.1 Accept the New Reality
- The most common response to a cut is denial dressed up as commitment
- Keep the old roadmap, stretch everyone, and hope the money comes back
- (Weitzel and Jonsson 1989) calls this the “faulty action” stage of decline: the wrong remedy (working harder) applied to the wrong diagnosis (the project has shrunk)
- The first step downsizing is to re-plan around the resources you actually have, not the ones you used to have
- Answer two questions:
- What must this project still do to be worth continuing?
- What can it afford to stop doing?
- Don’t wait for certainty: “we’ll get through this somehow” is not a plan
- Plan for the cut being permanent, and treat restoration as a bonus
F.2 Re-decide What the Project Is For
- A significant cut invalidates the mission statement, which was written for a project you no longer have
- Re-derive a minimum viable project from first principles
- Everything outside that core is now:
- Deferred: shelved with a note explaining what it was and why it was cut
- Delegated: handed to community members who can carry it independently
- Dropped: acknowledged as no longer part of the project
- A 50% cut is “do half the things properly, or do everything half as well”
- Choosing the former deliberately greatly improves chances of survival
F.3 Sequence the Cuts
- Cut in an order that protects the project’s ability to recover
- First, reduce scope: it is reversible, and it costs no people
- Then, simplify process and tooling
- Fewer platforms, fewer active commitments, fewer moving parts
- But beware consolidation that creates new single points of failure
- Then, reduce people, as late and as fairly as you can
- Last, cut the things that generate future resources
- Final reports, funder relationships, and reputation
- Losing eligibility for the next grant accelerates decline (Wruck 1990)
- Write down each cut and the reason for it so it can be reversed if resources return
- This is the opposite of abrupt closure, where restoration is usually off the table
F.4 Renegotiate, Don’t Just Absorb
- A funding cut is not a quiet instruction to deliver the same results for less
- Renegotiate deliverables and deadlines with sponsors and users
- Silence and minimization do more harm than honest news (Coombs 2021)
- The project’s advance directive should include “what happens if we lose half our funding”
- If it does not, writing that answer down is the first concrete step
F.5 Who Stays and Who Goes
- Deciding who stays is the hardest part of leading through a cut
- Firing and Being Fired covers the mechanics
- This section is about choosing
- Make the criteria explicit and apply them consistently
- Perceived favoritism does lasting damage to the people who remain
- Decide by the project’s future needs, not by seniority or by loyalty to the past
- The skills that built the project are not necessarily the ones it needs now
- Involve others in the decision where you can
- You are not objective, and you may be the last to see your own blind spots
- Do not make departure contingent on training a replacement
F.6 Survivors
- The people who remain are not necessarily the lucky ones
- They keep the project but inherit more work per person
- Survivor guilt is real and common:
- Name this explicitly and make space for it
- If the people who left were not treated decently, the people who stayed will assume they are next and will start looking elsewhere
- Don’t “reward” survivors with impossible expectations
- “Thank you for staying, now do two jobs” turns a cut into a slow-motion shutdown
F.7 Watch for the Death Spiral
- A cut rarely lands all at once
- It triggers indirect losses that can be larger than the cut itself
- The most capable people often leave voluntarily once the future is uncertain
- Cascading failure: collaborators and funders scale back their involvement, which justifies further cuts
- Sometimes the honest conclusion is that a 50% cut is really the first step to closure
- In that case, treat it as deliberate closure rather than letting the project bleed out slowly
F.8 Exercises
F.8.1 The Minimum Viable Project
- Write a one-paragraph description of the smallest version of your project that would still be worth keeping alive.
- List three things that you would defer, delegate, or drop if your funding and/or team was cut in half.
F.8.2 Renegotiate
Your project’s funding is being cut by half in three months.
- Draft the message you send to your funder explaining what you will still deliver and what you will no longer be able to.
- Draft the one-sentence message you send to your users. How does it differ from the funder’s message?
F.8.3 Who Stays
Your project is losing half its people.
- What criteria would you use to decide who stays?
- What criteria are you most tempted to use, and how do they differ from the ones you just wrote down?
- Who else should be in the room when the decision is made?